Home About Us Cathodic Protection Disaster Relief In the News Recent Projects Past Projects Specialties BOLI Wage Ruling Equipment Transportation Fabrication Contact Us Links
(C) 2016 GREAT WESTERN CORPORATION P.O. BOX 986    NORTH BEND, OR  97459  U.S.A. Phone: (541) 756-5627  |  Fax: (541) 756-7800
Cathodic Protection
The Tasks - Page 4:
10.  Electrical:        a.  Drill holes for anchors to secure conduit or             hang header run        b.  Install Conduit and anchors        c.  Pull wires        d.  Label wires        e.  Test wires per specifications                      
Letters of Recommendation
The Basics
CP Tasks
9.  Blasting & Zincing:      a.  Ensure negative air and heating system is           operating & that concrete surface temp and           humidity requirements have been reached      b.  Sandblast concrete surface      c.  Mask zone boundaries and any exposed metal           brackets or pipes, etc.      d.  Spray zinc and test millage during production      e.  Do pull-tests to ensure adequate bond strength      f.   Spray zinc to touch-up pull test locations
Previous