The Tasks - Page 4:
10. Electrical: a. Drill holes for anchors to secure conduit or hang header run b. Install Conduit and anchors c. Pull wires d. Label wires e. Test wires per specifications
Letters ofRecommendation
TheBasics
CPTasks
9. Blasting & Zincing: a. Ensure negative air and heating system is operating & that concrete surface temp and humidity requirements have been reached b. Sandblast concrete surface c. Mask zone boundaries and any exposed metal brackets or pipes, etc. d. Spray zinc and test millage during production e. Do pull-tests to ensure adequate bond strength f. Spray zinc to touch-up pull test locations